Due to COVID-19 restrictions, refurbishment projects at Mallachie planned for Spring 2020 had to be postponed. Below are projects engaged during late 2020 to November 2021 ready for 2022.

Mallachie Refurbs

Mallachie Refurbishments

Shower-1.jpg

Mallachie
Main Bathroom

Main Bathroom
Refurbishment

 

Late November 2021 sees the complete refurbishment of the main bathroom including bathtub, toilet, washbasin, fittings, towel heater rail, shower and tiling.

Image for item informational purposes only,

actual fitting may vary

Mallachie Ensuite

Refurbishment

 

Late 2020 saw the complete refurbishment of the ensuite bathroom including toilet, washbasin, shower, fittings, towel heater rail, under-floor heating and tiling. Final under-floor, shower base and tiling adjustments scheduled for November 2021.

Ensuite2.JPG

Mallachie
Ensuite

GreenRoom-1.png

Mallachie Washroom
Refurb

Mallachie Washroom

& Toilet Refurb

 

The Mallachie Green Washroom & Toilet is scheduled for refurbishment during late November 2021 including toilet, washbasin, fittings, towel heater rail and tiling.